Most Ontario homeowners pay between $2,500 and $5,000 to upgrade from a 100-amp to a 200-amp electrical panel, including the ESA permit and the utility reconnection. Replacing a panel at the same amperage usually costs less, around $1,500 to $3,000. Underground services, meter moves and 400-amp upgrades can push the total well past $5,000.
Where your home lands in that range depends on a few factors. Here’s what they are and how to budget for them.
Key Takeaways
- A 100A to 200A panel upgrade typically costs $2,500 to $5,000 in Ontario
- The biggest price swings come from the utility service, the meter location and the condition of your existing wiring
- The ESA permit is a small part of the bill, often under $100 when a licensed contractor files it
- Ask for an itemized written quote that lists permits, utility fees and any repairs
Typical Panel Upgrade Costs in Ontario
Here’s what GTA homeowners commonly pay in 2026 for the most frequent types of panel work:
- Panel replacement, same amperage: $1,500 to $3,000
- 100A to 200A upgrade, overhead service: $2,500 to $5,000
- 100A to 200A with underground service or a meter relocation: $4,500 to $8,000 or more
- 200A to 400A upgrade: $4,000 to $7,500 or more
These are typical market ranges, not fixed prices. Your final cost depends on what an electrician finds on site.
What Drives the Cost of a Panel Upgrade?
Amperage
A bigger service needs a bigger panel, heavier conductors and a larger meter base. Going from 100A to 200A is the most common upgrade in the GTA and is usually the best value. Jumping to 400A costs considerably more because the equipment is larger and the utility often has to change its side of the connection too.
Utility Service Upgrade
A true service upgrade is more than a panel swap. The service entrance cable, the mast on an overhead service and the meter base all need to be rated for the new amperage. Your local utility, such as Toronto Hydro, Alectra, Hydro One or Elexicon, must also disconnect and reconnect power and may need to upgrade the line to your house. Underground services cost more because the cable runs below grade.
Moving the Meter or Panel
If your panel sits in a spot that no longer meets code, such as a cramped closet or a bathroom, it may need to move. Relocating the meter or panel adds cable, labour and sometimes exterior work, which can add several hundred to a few thousand dollars.
Older Wiring
Homes with fuse boxes, knob-and-tube wiring, aluminum branch circuits or missing grounding often need extra work before a new panel can be energized. These issues usually show up once the old panel is opened. If you’re still deciding whether an upgrade is needed at all, our guide to the signs your home needs an electrical panel upgrade is a good place to start.
What Does the ESA Permit Add to the Cost?
In Ontario, panel and service work requires a notification of work with the Electrical Safety Authority (ESA). Under ESA’s 2026 fee guide, a residential service change filed by a licensed contractor is subject to a minimum fee of about $92. The same work filed by a homeowner costs more, roughly $212.
If other work is added to the same notification, such as new circuits for an EV charger, the fee goes up accordingly. Your utility also won’t restore power until ESA authorizes the connection, so the permit is a required step, not an optional extra. For the full picture, read our ESA permit guide for GTA homeowners.
Hidden Costs to Watch For
Some costs don’t appear in a quick phone quote. Ask about these before you sign:
- Utility disconnect and reconnect fees: Often between $65 and $300 during regular hours, depending on your utility and whether the work happens at the meter or the pole. After-hours work costs more.
- Grounding and bonding: Older homes may need new ground rods or bonding to water and gas lines to meet current code.
- Drywall and paint: Opening walls to reroute cables leaves patching work behind.
- Code corrections: Problems found on existing circuits may need to be fixed before the new panel passes inspection.
How to Get an Accurate Quote
- Book an in-home assessment instead of relying on a phone estimate
- Share your future plans, such as an EV charger, heat pump, hot tub or basement suite, so the panel is sized for the next 20 years
- Ask for a load calculation if you’re unsure whether you need 200A or more
- Request an itemized quote that separates the panel, service work, permit, utility fees and repairs
- Confirm the contractor is ESA-licensed and will file the notification for you
Frequently Asked Questions
How much does it cost to upgrade from 100 amp to 200 amp in Ontario?
Most homeowners pay $2,500 to $5,000 for a 100A to 200A upgrade with an overhead service. Underground services, meter relocations and older wiring can raise the total to $8,000 or more.
How long does a panel upgrade take?
Most upgrades are completed in one day, with the power off for several hours. Scheduling the utility disconnect can add a few days or weeks of lead time before the work date.
Can I replace my breaker panel without upgrading my service?
Yes. If your current service is large enough and the panel is simply old, full or unsafe, a same-amperage replacement is an option and usually costs $1,500 to $3,000.
Do I need a permit to replace an electrical panel in Ontario?
Yes. Panel replacements and service upgrades must be reported to ESA and inspected. Your licensed contractor should file the notification and arrange the inspection.
Is a 200-amp panel upgrade worth it?
For most GTA homes, yes. A 200A service handles modern loads like EV chargers, heat pumps and central air, and it can make insuring and selling your home easier.
Get a Clear Price on Your Panel Upgrade
At SiteTech Electrical, our ESA-licensed team (Licence #7013789) handles electrical panel upgrades across the GTA, from the load calculation and permit to the utility coordination and final inspection. Learn more about our residential electrical services, or call us at (647) 939-3239 to request a free estimate with an itemized quote and no surprises.